5 August 2022 The dilemmas and countermeasures of environmental supervision in the Three Gorges Reservoir
Author Affiliations +
Proceedings Volume 12326, 2nd International Conference on Materials Chemistry and Environmental Engineering (CONF-MCEE 2022); 123260T (2022) https://doi.org/10.1117/12.2646218
Event: 2nd International Conference on Materials Chemistry and Environmental Engineering (CONF-MCEE 2022), 2022, ONLINE, United States
Abstract
The Three Gorges Project is the biggest water project, and it has important strategic value as well as deep environmental effects. So, it’s necessary to implement environmental supervision in this area. However, there is environmental supervision dilemma which is discussed in this article: the legislative conflict, disordered environmental monitoring system and fragmentation of geographical position. In this study, in order to improve the environmental supervision implementation in the reservoir area, the cause and status quo in terms of those problems mentioned above are analyzed. Countermeasures such as resolving the legislative conflicts, building a unified and coordinated environmental monitoring system, and handling the cross-regional water environment supervision are provided.
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Zihao Wu "The dilemmas and countermeasures of environmental supervision in the Three Gorges Reservoir", Proc. SPIE 12326, 2nd International Conference on Materials Chemistry and Environmental Engineering (CONF-MCEE 2022), 123260T (5 August 2022); https://doi.org/10.1117/12.2646218
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Environmental monitoring

Pollution

Water contamination

Pollution control

Control systems

Environmental management

Legal

RELATED CONTENT


Back to Top