Paper
2 August 2000 Design issues for the active control system of the California Extremely Large Telescope (CELT)
Gary A. Chanan, Jerry E. Nelson, Catherine Mayumi Ohara, Edwin Sirko
Author Affiliations +
Abstract
We explore the issues in the control and alignment of the primary mirror of the proposed 30 meter California Extremely Large Telescope and other very large telescopes with segmented primaries (consisting of 1000 or more segments). We show that as the number of segments increases, the noise in the telescope active control system (ACS) increases, roughly as (root)n. This likely means that, for a thousand segment telescope like CELT, Keck-style capacitive sensors will not be able to adequately monitor the lowest spatial frequency degrees of freedom of the primary mirror, and will therefore have to be supplemented by a Shack-Hartmann-type wavefront sensor. However, in the case of segment phasing, which is governed by a `control matrix' similar to that of the ACS, the corresponding noise is virtually independent of n. It follows that reasonably straightforward extensions of current techniques should be adequate to phase the extremely large telescopes of the future.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Gary A. Chanan, Jerry E. Nelson, Catherine Mayumi Ohara, and Edwin Sirko "Design issues for the active control system of the California Extremely Large Telescope (CELT)", Proc. SPIE 4004, Telescope Structures, Enclosures, Controls, Assembly/Integration/Validation, and Commissioning, (2 August 2000); https://doi.org/10.1117/12.393941
Lens.org Logo
CITATIONS
Cited by 17 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Sensors

Telescopes

Actuators

Mirrors

Large telescopes

Control systems

Wavefronts

RELATED CONTENT

Modeling a large submillimeter-wave observatory
Proceedings of SPIE (August 10 2010)
A Near Infrared Astronomical Adaptive Optics System
Proceedings of SPIE (September 20 1989)
The Giant Magellan Telescope phasing system
Proceedings of SPIE (September 13 2012)
Primary mirror support system for the SUBARU Telescope
Proceedings of SPIE (June 01 1994)
Come On An Adaptive Optics Prototype Dedicated To Infrared...
Proceedings of SPIE (September 20 1989)

Back to Top