To determine the size of systematic and random errors of the measured distances were made test with the idea of the suppression of the random error by the averaging of the repeating measurement, and reducing systematic errors influence of by identifying their absolute size on the absolute baseline realized in geodetic laboratory at the Faculty of Civil Engineering CTU in Prague. The 16 concrete pillars with forced centerings were set up and the absolute distances between the points were determined with a standard deviation of 0.02 millimetre using a Leica Absolute Tracker AT401. For any distance measured by the calibrated instruments (up to the length of the testing baseline, i.e. 38.6 m) can now be determined the size of error correction of the distance meter in two ways: Firstly by the interpolation on the raw data, or secondly using correction function derived by previous FFT transformation usage. The quality of this calibration and correction procedure was tested on three instruments (Trimble S6 HP, Topcon GPT-7501, Trimble M3) experimentally using Leica Absolute Tracker AT401. By the correction procedure was the standard deviation of the measured distances reduced significantly to less than 0.6 mm. In case of Topcon GPT-7501 is the nominal standard deviation 2 mm, achieved (without corrections) 2.8 mm and after corrections 0.55 mm; in case of Trimble M3 is nominal standard deviation 3 mm, achieved (without corrections) 1.1 mm and after corrections 0.58 mm; and finally in case of Trimble S6 is nominal standard deviation 1 mm, achieved (without corrections) 1.2 mm and after corrections 0.51 mm. Proposed procedure of the calibration and correction is in our opinion very suitable for increasing of the accuracy of the electronic distance measurement and allows the use of the common surveying instrument to achieve uncommonly high precision. |
ACCESS THE FULL ARTICLE
No SPIE Account? Create one
Distance measurement
Calibration
Error analysis
Geodesy
Civil engineering
Interferometers
Interferometry